New Consultation: Environmental permitting: standard rules consultation no 18
Added on: 29/11/2018
The Environment Agency are inviting your views on the proposal to include the option for secondary abatement in this rule set:
- SR2018 No 9 standard rules Specified Generator, Tranche B low risk, base load operation between 0 - 0.9 MWth (megawatt thermal)